Error loading resource. Please reload page.

June Installations - Current Standings

Install Start Date
  • Marquee Status
  • Install Start Date
  • Project Manager
  • PE Support needed?
  • Wired or Wireless
  • Property Type
  • Installer
  • # of Switches
  • Room Count
  • 6/2/2025 - 6/4/2025
  • 6/4/2025 - 6/5/2025
  • 6/5/2025 - 6/9/2025
  • 6/9/2025 - 6/10/2025
  • 6/10/2025 - 6/23/2025
  • 6/23/2025

Map settings

Image Export Format

Image Size

PO #Marquee StatusInstall Start DateSite CodeProject ManagerSite TypePE Support needed?Wired or WirelessProperty TypeInstaller# of Switches# of APsRoom CountSite NameSite AddressCityStateZipcode
PO #Marquee StatusInstall Start DateSite CodeProject ManagerSite TypePE Support needed?Wired or WirelessProperty TypeInstaller# of Switches# of APsRoom CountSite NameSite AddressCityStateZipcode
PO-009263In Progress- Still on Cabling, NO HSIA for this week6/2/20251289Kevin KangetheHSIA and Cabling Fiber Installation (This is a multi-week Wyndham Fiber installation. This will take at least 4-6 weeks for completion. Fiber installation first, then AP/Headend installation. Per PM, Pangea will do the HSIA Installation and the Cabling.)FALSEWyndhamPangea Networks115Club Wyndham Canterbury750 Sutter StSan FranciscoCA94109
PO-009260 HSIA; PO-009094- CablingON HOLD- Tech Pulled off site6/2/20251574Kevin KangetheHSIA Upgrade (This will need to be redone please. Brian Corizzo can no longer take this job. This is a multi-week installation for Fiber, AP's and headend equipment.. ) MULTIWEEK till end 6/6FALSEWyndhamTechNet Partners80WorldMark Wolf Creek3618 N Wolf Creek DrEdenUT84310
pick up PO-007044Completed6/2/2025ACHotelStAugustineBrian FosterCabling (Please see the new cabling schedule below. This is still a multi-Week installation and I need Pablo's team coordinated for the dates listed below. Thanks! - Pull Wire to Lobby/Common Areas: -1st Floor 5 Days – 5/12-5/16 -Trim Out Corridor/Unit Ports: -2nd Floor 5 Days – 5/19 – 5/23 -3rd Floor 5 Days – 5/19 - 523 -4th Floor 5 Days – 5/27 – 5/31 -1st Floor 5 Days – 5/27 – 5/31 -Trim Out Lobby/Common Area Ports: -1st Floor 5 Days – 6/9 – 6/13 -IDF Racks, Equipment, Terminate Cables: 10 Days - 6/16 – 6/27 -MDF Racks, Equipment, Terminate Cables: 10 Days – 6/16 – 6/27 -UPS, Switches, Access Points, Programming , Hit Map: 10 Days – 7/7 – 7/18 )FALSEMarriotNetcom Technologies142AC Hotel St. Augustine159 King StreetSt. AugustineFL32084
T&MCompleted6/2/2025BNAGLRyan ReavisNew Construction Return Trip(return trip to get headend and heat mapping/port mapping . Multiple weeks upto 3)TRUEHiltonSmart Wifi Access10152180Canopy Nashville Downtown (Dual)910 Division StNashvilleTN 37203
T&MCompleted6/2/2025BNAGLRyan ReavisCCTV Installation Return Trip (Programming and aiming of cameras. Multiple weeks upto 3)FALSEHiltonSmart Wifi Access180Canopy Nashville Downtown (Dual)910 Division StNashvilleTN 37203
T&MCompleted6/2/2025BNAGLRyan ReavisPBX Installation Return Trip (return trip to get headend and heat mapping/port mapping Multiple weeks upto 3)FALSEHiltonSmart Wifi Access180Canopy Nashville Downtown (Dual)910 Division StNashvilleTN 37203
For PE Support onlyCompleted6/2/2025LAXMHOshanna BankoHSIA Install - Corning (Multiweeks for 6 weeks- ends 6/16)TRUEMarriottTechNet Partners176Residence Inn Los Angeles LAX/Manhattan1700 N Sepulveda BlvdManhattan BeachCA90266
InternalCompleted6/2/2025ALTAH Ryan RaevisHSIA upgrade (Possible Carryover from 5/26- Please confirm with the PM)TRUEHiltonCesar Melo11184311Hilton Orlando Altamonte Springs350 Northlake BoulevardAltamonte SpringsFL32701
PO-009518- sent as Daily Rate for 3 daysCompleted6/2/2025BRDRARyan ReavisNew Constrution Return Trip (Move IDF switches from temp MDF install to IDF and patch Public area AP install Router configuration Guest Speed test ISP Speed test RF Report in Ekahau Raw and PDF Picture of the Microtik Port mapping showing the end devices) (Possible Carryover from the week of 5/26- Please confirm with the PM)TRUEHilton 1st Edge Technologies, customer approved CO for up to 4 days of T&M66198Home2 Suites Ramsey8445 Bunker Lake BlvdRamseyMN55340
For PE Support onlyCompleted6/2/2025ArcadiaRidgevilleCharlestonKeith WoodAmicus HSIA installation. Full InstallTRUEn/aPE Support onlyArcadia Cold Storage, Ridgeville-Charleston SC15880 Dorchester RdRidgevilleSC29472
PO-009637Completed6/2/2025BRDRARyan ReavisConnected Room InstallationFALSEHilton Victory Communications66198Home2 Suites Ramsey8445 Bunker Lake BlvdRamseyMN55340
For PE Support onlyNo task6/2/2025CentroCityKeith WoodRGNET Configuration (PE to work with Seth on the completion of the RGNET licensing and configuration. )TRUENo Tech Needed470Centro CityNW 37th Ave & NW 7th StreetMiamiFL33125
Completed6/2/2025CentroCityKeith WoodDish Install (Revisit required for dispatch to Building A - Request technician dispatch to install SFP's and bring up IDF switches in Building A. Work with PE to confirm all 3 IDF's are up and communicating with MDF via fiber. Patch all copper from patch panel to switch's. If the patch panels are not properly labeled we will not touch them. PM will provide a patch matrix to the technician once assigned. Tools needed will be basic network toolkit, laptop with console connection. )TRUECalltek470Centro CityNW 37th Ave & NW 7th StreetMiamiFL33125
PO-009639Completed6/2/2025DENCHOshanna BankoConnected Room Installation (will also include Decom of 4 old equipments)FALSEHiltonVictory Communications12213336The Curtis Denver DoubleTree Hotel1405 Curtis StDenverCO80202-2349
T&M per Nicole, 1-day $720, + travel. Completed6/2/2025DSMUDJulie PennellHSIA Upgrade (Return Trip-Non-billable, install SIP server Cable management, clean and organize cabling in MDF/IDF Install Battery Back Ups)TRUEMarriotTechNet Partners45289Fairfield Inn & Suites Des Moines Urbandale8661 Plum DriveUrbandaleIA50322
PO-009645Completed6/2/2025ICTDBMohammad KhanFTG InstallHiltonVictory Communications63Hampton Inn Derby1701 Cambridge StreetDerbyKS67037
PO-009646Completed6/2/2025JAXGAMohammad KhanFTG InstallHiltonVictory Communications43760Spark Kingsland, GA104 May Creek DriveKingslandGA31548
PO-009560Completed6/2/2025LIHWBJessica MacConaghyHSIA Return trip (We are returning to remediate our original install. SOW: SOW Install 96 AP's Heat map Budget for install team which will be CRM $8600 for AP install $2800 Ekahau survey Travel billed as actual )TRUEHiltonCRM Technologies216Hilton Garden Inn Kauai Wailua Bay3-5920 Kuhio HighwayKapaaHI96746
PO-009652Completed6/2/2025LRDHWJory PinerHSIA upgrade, est 50hrsTRUEwirelessHilton Pangea Networks561105Homewood Suites Laredo at Mall del Norte98 Calle Del Norte RdLaredoTX78041-9143
PO-009653Completed6/2/2025MHTMNTyler LovingHSIA upgradeTRUEHiltonWired2Wifi Networks10160248DoubleTree Hotel Manchester Downtown700 Elm StreetManchesterNH3101
SQ-004524- PO-009580Completed6/2/2025MRYMBKevin KangetheReturn Trip (Additional APs/Cabling for Outdoor Spaces- VICTOR JAIMES NEEDS TO BE ASSIGNED THIS REQUEST. He is fully aware of the SOW & provided a quote for cabling & installation. There is an additional SOW (Change Order) that will be submitted to us for an additional cable for the garage cut by an unknown person. Victor will submit an invoice & needs the deposit paid ASAP to make 6/2/25 date. )TRUEIndependentSmartWiFi is returning tech196Monterey Tides2600 Sand Dunes Dr.MontereyCA93940
For PE Support onlyNo task6/2/2025ONTBSMariot Opening Interface/ PMSTRUEHilton No Tech Needed113Home2 Suites San Bernardino837 East Brier DriveSan BernardinoCA92408
PO-009654Completed6/2/2025ORFVB Ryan ReavisHSIA upgradeTRUEMarriottKhronos Inc.688146Courtyard Virginia Beach Norfolk5700 Greenwich RdVirginia BeachVA23462
PO-009052; $3,900.05 agreed upon, SQ-004172Completed6/2/2025OXNHSBen ReichardCabling (Cabling Scope of Work: 1 x New Public Area Run and certification 11 x Public Area Recertifications 116 x Guest Room Cabling Recertifications)FALSEFALSEHiltonSmart Wifi Access116Hampton Inn Camarillo50 West Daily DriveCamarilloCA93010
PO-009644Completed6/2/2025RALRLOshanna BankoConnected Room InstallationFALSEHiltonVictory Communications77Home2 Suites Redlands1342 Industrial Park AvenueRedlandsCA92374
PO-008951 - previously assigned, resend from AprilCompleted6/2/2025ROAHHBrian FosterHSIA Upgrade (Legacy Site)TRUEHiltonKhronos Inc.65799Hampton Inn Roanoke/Hollins-I-817922 Plantation RoadRoanokeVA24019
PO-009655Completed6/2/2025THANKOshanna BankoNew Construction (Opening June 12)TRUEHiltonTwisted Networx45689LivSmart Studios - Tullahoma, TN251 William Northern BoulevardTullahomaTN 37388
Handled by Stephane from Support Completed6/2/2025TheSalemInnCurwenHouse TheSalemInnhePeabodyHouse TheSalemInnTheWestHouseBen ReichardChanging cable modem to bridge mode, which should free up the only 1 public IP on the network. Which can then be used for our firewall.TRUEWired2Wifi NetworksThe Salem Inn - Curwen House The Salem Inn - The Peabody House The Salem Inn - The West House331 Essex Street 15 Summer Street 7 Summer Street Salem MA01970
PO-009794Completed6/2/2025TPAFLBrian FosterHSIA Return Trip (SOW: HLT-TPAFL-350-IDF5-AS06-2 - Keeps disconnecting / losing power. Need to check PSU / Power Outlets etc. See if Power is an issue or if its a switch issue. Heatmap HLT-TPAFL-36H-1216-AP207 - linking at 100m Check if old network is still in play / vendors / cutover if needed and take updated pics of mdf showing no old gear) Netcom did 1st work on this oneTRUEHiltonNetcom Technologies14271243x555 Westshore PlzTampaFL33609-1865
PO-009563Completed6/2/2025YUMRSMohammad KhanNew Construction (Opening June 19)TRUEHiltonSmart Wifi Access798150Hilton Garden Inn Yuma Pivot Point310 North Madison AvenueYumaAZ85364
Sent to KateCompleted6/4/2025BKWFFKevin KangetheHSIA Installation Return Trip (Smart Hands technician for Hotel opening. Danny has already added this to the schedule. I need a calltek per Nicole. )TRUEFALSEMarriot Calltek/ Technet55595Fairfield Inn & Suites Beckley WV248 Harper Park DriveBeckleyWV25801
CancelledIn progress6/4/2025BKWFFKevin KangetheHSIA Installation Return Trip (SOW- Serial interfacing, Pinning out DB9 and DB20 connections need a tech to plug into the servers )TRUEFALSEMarriot Calltek/ Technet55595Fairfield Inn & Suites Beckley WV248 Harper Park DriveBeckleyWV25801
No Support neededCompleted6/5/2025MITSD Tyler LovingHSIA Return Trip (just need a Calltech. we need to install a new UPS battery backup into the rack, connect switches too it and take photos. hand tools only shouldn't need PE support unless some major issue happens. MDF only design. 1ZE633380302740965)FALSEFALSEHiltonCalltek54675Hampton Inn Mitchell1920 Highland WayMitchellSD57301
PO-009211 Completed6/5/2025RILCO Oshanna BankoHSIA install (6/5 - 6/13 TECHNET fiber remediation and HSIA install. )TRUEHiltonTechNet Partners66792Hampton Inn & Suites Rifle499 Airport RoadRifleCO81650
T&M per Oshanna. 2 day-tripCompleted6/5/2025USTCROshanna BankoHSIA upgrade Return Trip (Vendor onboarding and SD WAN cutover. Please recruit Josh Whittaker he's local to site and did the HSIA. He would also be installing CR while onsite please. )TRUEHiltonPangea Networks60Castillo Real St Augustine530 A1A Beach BoulevardSaint AugustineFL32080
PO-009641- Pangea; PO-009643- Victory CommunicationsCompleted6/5/2025USTCROshanna BankoConnected Room InstallationFALSEHiltonPangea Networks and Victory Communications60Castillo Real St Augustine530 A1A Beach BoulevardSaint AugustineFL32080
PO-009263In Progress- Still on Cabling, NO HSIA for this week6/9/20251289Kevin KangetheHSIA and Cabling Fiber Installation (This is a multi-week Wyndham Fiber installation. This will take at least 4-6 weeks for completion. Fiber installation first, then AP/Headend installation. Per PM, Pangea will do the HSIA Installation and the Cabling.)FALSEWyndhamPangea Networks115Club Wyndham Canterbury750 Sutter StSan FranciscoCA94109
pick up PO-007044Completed6/9/2025ACHotelStAugustineBrian FosterCabling (Please see the new cabling schedule below. This is still a multi-Week installation and I need Pablo's team coordinated for the dates listed below. Thanks! - Pull Wire to Lobby/Common Areas: -1st Floor 5 Days – 5/12-5/16 -Trim Out Corridor/Unit Ports: -2nd Floor 5 Days – 5/19 – 5/23 -3rd Floor 5 Days – 5/19 - 523 -4th Floor 5 Days – 5/27 – 5/31 -1st Floor 5 Days – 5/27 – 5/31 -Trim Out Lobby/Common Area Ports: -1st Floor 5 Days – 6/9 – 6/13 -IDF Racks, Equipment, Terminate Cables: 10 Days - 6/16 – 6/27 -MDF Racks, Equipment, Terminate Cables: 10 Days – 6/16 – 6/27 -UPS, Switches, Access Points, Programming , Hit Map: 10 Days – 7/7 – 7/18 )FALSEMarriotNetcom Technologies142AC Hotel St. Augustine159 King StreetSt. AugustineFL32084
For PE support onlyCompleted6/9/20251502Keith WoodCabling (The team has returned per our schedule with the onsite renovations. PM confirmed that PE will be needed last week of June. This is going to Brian Corrizo for labor. PE only needed. This is a multi-week installation. 3-4 weeks)FALSECRM TechnologiesWorldMark Angels Camp123 Selkirk Ranch RdAngelsCA95222
For PE Support onlyNo task6/9/2025CentroCityKeith WoodRGNET Configuration (PE to work with Seth on the completion of the RGNET licensing and configuration. ) (Possible Carryover from 6/2, Please confirm with the PM)TRUENo Tech Needed470Centro CityNW 37th Ave & NW 7th StreetMiamiFL33125
PO-009771Completed6/9/2025ANDSCTyler Loving HSIA upgrade (labor calc 4435) 29 hrsTRUEwirelessHilton1st Edge Technologies44071Hampton Inn Anderson Interstate120 Interstate Blvd AndersonSC29621
PO-009782Completed6/9/2025BIXDTOshanna BankoCabling (Run New Fiber to 8 closets and add 3 Public Copper Lines)HiltonTechNet Partners195DoubleTree Hotel Biloxi940 Beach BoulevardBiloxiMS39530
internalCompleted6/12/2025DFWANKeith WoodRevisit for heatmapping, AP removal, WaterPark IDF/AP installation, multiple UPS installations, IDF cleanup. Must have the heatmap and AP removals during 6/12-6/16 due to occupancy restrictions. Crucial that site and techs work around PE schedule M-FTRUEHilton Cesar and Henry (6/12-6/16)659651606Hilton Anatole Dallas2201 North Stemmons FreewayDallasTX75207
internalCompleted6/10/2025DSMUDJulie PennellHSIA Upgrade ( *****Please use an internal tech****** Heat map the entire property This is non-billable to us so no budget SNA will have to cover)TRUEMarriotCesar Melo45289Fairfield Inn & Suites Des Moines Urbandale8661 Plum DriveUrbandaleIA50322
Sent to KateIn Progress6/10/2025DTWRSAlex Ocampo, NicoleUnoNet/Takeover Exisiting ((4) Meraki Stacking Cables need to be installed, 1 in each IDF, total of 4 IDF's. Jake from PE team needs to confirm they are working once connected. )TRUEHilton TechNet Partners91Home2 Suites West Bloomfield Detroit33098 Northwestern HighwayWest Bloomfield TownshipMI48322
PO-009740Completed6/9/2025FLLTMJulie Pennell/ Nicole WilbanksHSIA upgrade Return Trip (PM requesting Pangea)TRUEHiltonPangea Networks548Hampton Inn Ft. Lauderdale4499 W Commercial BlvdTamaracFL33319
PO-009774Completed6/9/2025HYSTSOshanna BankoHSIA Upgrade - labor calc (36hrs) TRUEMarriot 1st Edge Technologies56081TownePlace Suites Hays4001 General Hays RoadHaysKS67601
PO-009649-Discovery will be treated as COCompleted6/9/2025IADCAJulie PennellPBX UpgradeMarriotTechNet Partners149Courtyard Dulles Airport Chantilly3935 Centerview DrChantillyVA20151
PO-009761- $2050 plus actual travel per nicoleCompleted6/9/2025ISPSBNicole WilbanksHSIA Upgrade (*****This needs to be Metro IP for the return please****** Install final first floor switch and connect Public APs Move over vendors Complete heatmap r)TRUEHiltonMetro IP681135Hilton Garden Inn Stony Brook1 Circle RdStony BrookNY11794
In progress6/14/2025KOAHR Jory PinerHSIA Upgrade Return Trip (***Approved by Nicole **Victor Jaimes w/ Smartwifi is sending out Jaime Diaz Install remainder of public space APs get rid of old LSP gear troubleshoot any issues)TRUEIndependentSmart Wifi Access per PM9146121Ko'A Kea Hotel & Resort2251 Poipu RdKoloaHI96756
prev PO is CW 25024Completed6/9/2025LAXXIMohammad KhanHSIA Upgrade Return Trip (Return trip for heatmap and port mapping) SmartWIFI to return per PMTRUEHiltonSmart Wifi Access14167281Hilton Garden Inn LAX5249 W Century BlvdLos AngelesCA90045
PO-009735- $720/day plus travelCompleted6/10/2025LCKCO Julie Pennell/ Nicole WilbanksHSIA Return Trip (Return trip to install UPS and cutover SDWAN on 6/10 ) Est. 1 day. money left in budgetTRUEHilton TechNet Partners664106Home2 Suites Columbus Downtown412 East Main StreetColumbusOH43215
SQ-005534- PO-00974Completed6/9/2025MBTDTKevin KangetheHSIA Upgrade Return Trip (SOW: Pool aps missing antennas (These were shipped to site & we need them located & stored for our return visit). IPTV will need to migrate over - will need vendor info/ticket opened. Appears to still be lots of old equipment/cabling in racks. May need site to work with us to identify/clean this site up. @Hugh Ladd Old device? - TP-Link device goes to CSS_Panel. HLT-MBTDT-46-B-AP004 - This ap needs to be factory reset (it has 10.100.0.x IP). Currently not plugged in Offline APs (see note about aps in wrong locations): HLT-MBTDT-36H-537-AP098 HLT-MBTDT-36H-405-AP066 HLT-MBTDT-36H-202-AP029 HLT-MBTDT-44-HALLWAY-AP015 HLT-MBTDT-46-CONCIERGE-AP012 HLT-MBTDT-46-BOARDROOM-AP011 HLT-MBTDT-46-A-AP006 HLT-MBTDT-46-B-AP004 (needs to be reset)TRUEHiltonTechNet Partners168DoubleTree Hotel Murfreesboro1850 Old Fort ParkwayMurfreesboroTN37129
PO-009719Completed6/9/2025MHTMNTyler LovingConnected Room InstallationFALSEHiltonVictory Communications10160248DoubleTree Hotel Manchester Downtown700 Elm StreetManchesterNH3101
SQ-005519- PO-009725No task6/9/2025MNZGWJason BoothCCTV - GM approved quote for 6 CCTV camerasFALSEHilton Netcom Technologies98Tru Hotel Manassas - 988310550 Gateway BoulevardManassasVA20110
PO-009717Completed6/9/2025MYROBOshanna BankoConnected Room Installation Return Trip ( still full install)FALSEHiltonVictory Communications238Myrtle Beach Oceanfront, Tapestry Collection3200 South Ocean BoulevardMyrtle BeachSC29577
PO-009562In Progress6/9/2025PHXANTyler LovingHSIA upgrade (receiving certs from Altru sometime this week of 5/12/25 Altru might be able to do this install for us since they are local to the city.)TRUEwirelessHilton1st Edge Technologies6112192Hilton Garden Inn Phoenix Airport North3838 East Van Buren StreetPhoenixAZ85008
PO-007592-prev POCompleted6/9/2025PSPYV Mohammad KhanHSIA Return Trip (Return trip for port mapping and re-heatmap) (SmartWiFi requested by PM)TRUEBest WesternSmart Wifi Access55294Spark Yucca Valley Joshua Tree56525 29 Palms HwyYucca ValleyCA92284
PO-009718Completed6/9/2025PSPYV Mohammad KhanConnected Room InstallationFALSEBest WesternVictory Communications55294Spark Yucca Valley Joshua Tree56525 29 Palms HwyYucca ValleyCA92284
To move to 6/16 weekIn Progress6/9/2025PVUOR Brian FosterHSIA Return Trip ( The redesign has been completed and materials for the switch and patch cord installation are on-site, design to accommodate the connected room. Will need another switch and patch cords for the connected room. This SOW should only be for 1 tech 1 day. Remaining SOW to include an Inventory check for Connected room materials have been on-site since 5/24/24)TRUEHiltonTBD129Hampton Inn & Suites Orem851 West 1250 SouthOremUT84058
PO-009786- one day $720 plus travelCompleted6/9/2025PWMAMJory PinerHSIA upgrade Return Trip ( Need stacking cables Rename Stacked switching after stacked No SDwan install because its a Spark Missing PSU (shipping issue) SSID is "days inn" until conversion is complete Splash turned off for now - turn back on after conversion complete just a reminder that we changed the SSID to "days inn" and turned off the splash page. This was per Andrew at Hilton. Once the conversion is complete, then we can change that)TRUEHiltonWired2Wifi Networks480149Spark Airport Portland Airport Maine Mall461 Main Mall RdSouth PortlandME04106
PO-009720Completed6/9/2025QWMLCOshanna BankoConnected Room InstallationFALSEHiltonVictory Communications761109Home2 Suites Longmont710 South Sherman StreetLongmontCO80501
PO-009727Completed6/9/2025THANKOshanna BankoFTG Install (with Sahin if hes available)FALSEHiltonVictory Communications89LivSmart Studios - Tullahoma, TN251 William Northern BoulevardTullahomaTN 37388
PO-009728Completed6/9/2025THANKOshanna BankoConnected Room Installation (with Sahin if hes available)FALSEHiltonVictory Communications89LivSmart Studios - Tullahoma, TN251 William Northern BoulevardTullahomaTN 37388
PO-009263Completed6/16/20251289Kevin KangetheHSIA and Cabling Fiber Installation (This is a multi-week Wyndham Fiber installation. This will take at least 4-6 weeks for completion. Fiber installation first, then AP/Headend installation. Per PM, Pangea will do the HSIA Installation and the Cabling.)TRUEWyndhamPangea Networks115Club Wyndham Canterbury750 Sutter StSan FranciscoCA94109
pick up PO-007044Completed6/16/2025ACHotelStAugustineBrian FosterCabling (Please see the new cabling schedule below. This is still a multi-Week installation and I need Pablo's team coordinated for the dates listed below. Thanks! - Pull Wire to Lobby/Common Areas: -1st Floor 5 Days – 5/12-5/16 -Trim Out Corridor/Unit Ports: -2nd Floor 5 Days – 5/19 – 5/23 -3rd Floor 5 Days – 5/19 - 523 -4th Floor 5 Days – 5/27 – 5/31 -1st Floor 5 Days – 5/27 – 5/31 -Trim Out Lobby/Common Area Ports: -1st Floor 5 Days – 6/9 – 6/13 -IDF Racks, Equipment, Terminate Cables: 10 Days - 6/16 – 6/27 -MDF Racks, Equipment, Terminate Cables: 10 Days – 6/16 – 6/27 -UPS, Switches, Access Points, Programming , Hit Map: 10 Days – 7/7 – 7/18 )FALSEMarriotNetcom Technologies142AC Hotel St. Augustine159 King StreetSt. AugustineFL32084
For PE support onlyCompleted6/16/20251502Keith WoodCabling (The team has returned per our schedule with the onsite renovations. PM confirmed that PE will be needed last week of June. This is going to Brian Corrizo for labor. PE only needed. This is a multi-week installation. 3-4 weeks)FALSECRM TechnologiesWorldMark Angels Camp123 Selkirk Ranch RdAngelsCA95222
In Progress6/16/2025ACYTXOshanna BankoHSIA Upgrade - 53 hoursTRUEMarriotTBD868105Tribute by Marriott Atlantic City3000 Boardwalk At, Morris Ave,Atlantic CityNJ08401
In Progress6/16/2025AGSGVJory PinerNew Construction, ~34hrs HSIATRUEHilton TBD45082Tru Augusta Washington Road2853 Washington RoadGrovetownGA30909
In Progress6/16/2025AHNATJulie PennellHSIA Upgrade Return Trip (Full SOW: -4 new cables & AP's - The APs need to be added to the Meraki dashboard. I don't see them. -Get HLT-AHNAT-36H-412-AP058 online -Heatmap -Cutover MX -Decom legacy equipment >Missing Items Updated MDF Pictures with old equipment removed. Final RF Report in Ekahau Raw and PDF Picture of the ANIRA (labeled) or SD WAN Fiber certs has 1 failed cable - is this for site to fix? we may need updated certs showing all cables passed)TRUEHilton TBD675130 Homewood Suites Athens Downtown University750 East Broad StreetAthensGA30601
In Progress6/16/2025DENCP Ryan ReavisHSIA Takeover (Multiweek-Assumed two week to complete)TRUEHiltonTBD8169270DoubleTree Cherry Creek455 South Colorado BoulevardDenverCO80246
In Progress6/16/2025DENCP Ryan ReavisHSIA Refresh (Multiweek-Assumed two week to complete)TRUEHiltonTBD270DoubleTree Cherry Creek455 South Colorado BoulevardDenverCO80246
In Progress6/16/2025DNBDHBen ReichardHSIA upgradeTRUEHilton TBD158Hilton Garden Inn Danbury119 Mill Plain RoadDanburyCT06811
In progress6/16/2025FFALL Tyler LovingNew Construction TRUEHiltonTBD57872Home2 Suites Outer Banks Kill Devil Hills107 South Virginia Dare TrailKill Devil HillsNC27948
In Progress6/16/2025FLLMR3Oshanna BankoFTG InstallFALSEHilton Victory Communications101Home2 Suites Miramar Ft. Lauderdale2800 Southwest 149th AvenueMiramarFL33027
In Progress6/16/2025ILMGSNicholas KennedyHSIA upgradeTRUETBD116Golden Sands Carolina Beach Oceanfront, Tapestry1211 Lake Park Boulevard SouthCarolina BeachNC28428
In Progress6/16/2025INDNEJulie PennellHSIA Upgrade - labcalc 1722, 37 hrsTRUEHiltonTBD573128Hampton Inn Indianapolis-Ne/Castleton6817 E. 82nd StreetIndianapolisIN46250
In Progress6/16/2025ISPSBJulie PennellConnected Room InstallationFALSEHiltonVictory Communications681135Hilton Garden Inn Stony Brook1 Circle RdStony BrookNY11794
In Progress6/16/2025LNDNORyan ReavisConnected Room Installation Return TripFALSEHilton Victory Communications71Hampton Inn London-North200 Alamo DriveLondonKY40741
In Progress6/16/2025LNDNORyan ReavisFTG InstallationHilton TBD71Hampton Inn London-North200 Alamo DriveLondonKY40741
In Progress6/16/2025MKCBEJanice BlydenburghConnected Room Installation (wireless)FALSEHiltonVictory Communications54980Hampton Inn Belton/Kansas City Area16410 Cornerstone DriveBeltonMO64012
In Progress6/16/2025OKCNQKevin KangetheHSIA Upgrade Return Trip (Perform Heat Map. Gather all outstanding deliverables. Final MDF/IDF Pictures showing bolted, grounding, label, power and patch panel cords ( zoom in and full view) Picture of the APs showing MAC/SN, label and location UPS info - serial # and location Guest Speed test ISP Speed test RF Report in PDF Port mapping showing the end devices For upgrades, ensure that the old equipment are decommissioned after the install)TRUEMarriotCielo was initial tech 2/2024110Courtyard Oklahoma City North13511 Highland Park BoulevardOklahoma City,OK73120
In progress6/16/2025PHXANTyler LovingConnected Room InstallationFALSEHiltonVictory Communications192Hilton Garden Inn Phoenix Airport North3838 East Van Buren StreetPhoenixAZ85008
In progress6/16/2025PHXANTyler LovingFTG InstallFALSEHiltonVictory Communications192Hilton Garden Inn Phoenix Airport North3838 East Van Buren StreetPhoenixAZ85008
In progress6/16/2025SACHHBrian FosterHSIA Install Highgate Return Trip (SOW: Bring all equipment online (currently, ISP is not inside the new MDF) Install Missing Twinax cables RF entire hotel Move all vendors Provide all deliverables )TRUEHiltonTBD44886Hampton Inn Sacramento/Rancho Cordova10755 Gold Center DriveRancho CordovaCA95670
In Progress6/16/2025SANPYTyler LovingCabling ( Hilton flag. need panduit certified team. installer team will also be supplying the materials. targeting 6/16/25 with the property.)FALSEHiltonPM prefers Victor Jaimes108Hampton Inn & Suites San Diego Poway14068 Stowe DrivePowayCA92064
In progress6/16/2025SFYMABen ReichardHSIA UpgradeTRUEHiltonTBD143Hilton Garden Inn Springfield800 Hall of Fame AvenueSpringfieldMA1105
In progress6/16/2025SHVLABrian FosterCabling (Cabling has been approved, and the site needs to be scheduled as soon as possible. Please schedule with TechNet for 6/16. TechNet supplied the quote that was approved. SOW: SOW would be cable runs for public spaces and troubleshooting of failed certification lines )FALSEHiltonTechNet Partners per PM79Hampton Inn Shreveport Airport5226 Monkhouse DriveShreveportLA71109
In progress6/16/2025TRIDTKevin KangetheHSIA upgrade Return Trip (Request for Caltech. SDWAN Cut-Over. Troubleshoot Room 216. )TRUEHiltonCalltek7104184DoubleTree Hotel Johnson City211 Mockingbird LaneJohnson CityTN 37604
SQ-001921In progress6/16/2025TULARBrian FosterHSIA Upgrade Return Trip (please move to the week of 6/16- budget of $5,771.00 is left of the labor budget. The full HSIA SOW. minus racking switches but this is not confirmed. so the full HSIA SOW. )TRUEHiltonSmart Wifi Access (Smart Wifi, has already received the deposit for the requested work and has requested the schedule for the week of 6/9/2025)977107Hilton Garden Inn Broken Arrow420 West Abany StBroken ArrowOK74012
SQ-003640 PO-009364 (50% deposit)In progress6/16/2025TULARBrian FosterCabling (107 Rooms - *Billiable*Change Order-Fiber Runs & Public Area APs)HiltonSmart Wifi Access977107Hilton Garden Inn Broken Arrow420 West Abany StBroken ArrowOK74012
T&MIn Progress6/16/2025YULMD2Nicole WilbanksHSIA Return Trip (taking over the admin networks to make them Marriott standard, RF testing too, And getting the patio network online)TRUEMarriotMetro IP142Renaissance Montreal Downtown Hotel1250 Boulevard Robert-BourassaMontrealQC H3B 3B8
For PE Support onlyCompleted6/16/2025YVRVSKevin KangetheHSIA upgrade Return Trip (Billable, Install UPS. Install Server. RF Sign Off & deliverables. )TRUEMarriottNo Tech needed390Sheraton Vancouver Airport Hotel7551 Westminster HighwayRichmondBritish Columbia V6X 1A3
pick up PO-007044Completed6/23/2025ACHotelStAugustineBrian FosterCabling (Please see the new cabling schedule below. This is still a multi-Week installation and I need Pablo's team coordinated for the dates listed below. Thanks! - Pull Wire to Lobby/Common Areas: -1st Floor 5 Days – 5/12-5/16 -Trim Out Corridor/Unit Ports: -2nd Floor 5 Days – 5/19 – 5/23 -3rd Floor 5 Days – 5/19 - 523 -4th Floor 5 Days – 5/27 – 5/31 -1st Floor 5 Days – 5/27 – 5/31 -Trim Out Lobby/Common Area Ports: -1st Floor 5 Days – 6/9 – 6/13 -IDF Racks, Equipment, Terminate Cables: 10 Days - 6/16 – 6/27 -MDF Racks, Equipment, Terminate Cables: 10 Days – 6/16 – 6/27 -UPS, Switches, Access Points, Programming , Hit Map: 10 Days – 7/7 – 7/18 )FALSEMarriotNetcom Technologies142AC Hotel St. Augustine159 King StreetSt. AugustineFL32084
For PE support onlyCompleted6/23/20251502Keith WoodCabling (The team has returned per our schedule with the onsite renovations. PM confirmed that PE will be needed last week of June. This is going to Brian Corrizo for labor. PE only needed. This is a multi-week installation. 3-4 weeks)TRUECRM TechnologiesWorldMark Angels Camp123 Selkirk Ranch RdAngelsCA95222
In Progress6/23/2025APFNHNicholas KennedyConnected Room InstallationFALSEHilton Khronos, Inc.10134199Hilton Naples5111 Tamiami Trail NorthNaplesFL34103
PO-009226Completed6/23/2025BOSFXBen ReichardConnected Room InstallationFALSEHiltonVictory Communications139Hampton Inn & Suites Foxborough Mansfield2 Foxborough BoulevardFoxboroughMA02035
In Progress6/23/2025DENCP Ryan ReavisHSIA Takeover (Multiweek-Assumed two week to complete)TRUEHiltonTBD270DoubleTree Cherry Creek455 South Colorado BoulevardDenverCO80246
In Progress6/23/2025DENCP Ryan ReavisHSIA Refresh (Multiweek-Assumed two week to complete)TRUEHiltonTBD270DoubleTree Cherry Creek455 South Colorado BoulevardDenverCO80246
In Progress6/23/2025FAYCCJessica MacConaghyHSIA upgrade (Site completed the cabling but they are asking for our install team to do a penetration for the outdoor AP. Attempting to get pictures so I can understand the cost. The penetration will be through a single cinder block wall. )HiltonTBD131Hampton Inn Fayetteville Fort Bragg1700 Skibo RoadFayettevilleNC28303
In Progress6/23/2025FLLMTNicole WilbanksPBX Mitel InstallationFALSEHiltonTBD147Home2 Suites Weston Ft. Lauderdale15990 SW 14th StDavieFL33326
In Progress6/23/2025MCIMSKevin KangetheHSIA upgrade Return Trip (Remaining Budget - $9,505.50 187 In Room AP Installation. 27 Ceiling AP Installation. 2 Outdoor Ceiling AP Installation. 9 Battery/PDU Installation. RF Survey. Final Closeout & Documentation. 1 MDF Clean UP. 7 IDF Clean UP. Third Party Moves. )HiltonTBD20216356DoubleTree Hotel Kansas City Overland Park10100 College BoulevardOverland ParkKS66210
Stuck6/23/2025PASPABrian FosterHSIA upgradeTRUEHiltonTBD124Hilton Garden Inn Arcadia Pasadena199 North Second AvenueArcadiaCA91006
PO-009236Completed6/23/2025TPAVEBen ReichardConnected Room Installation (Return trip needed on the week of 5/12 waiting on equipment but through Insight to arrive 5/5. )FALSEHiltonVictory Communications86Hampton Inn Tampa-Veterans Expwy (Airport North)5628 W Waters AveTampaFL33634
PO-009421Completed6/23/2025WASCAJory PinerFTG Install Return Trip (Please ask for Brendan Pavich. He did the installation last time. )FALSEHiltonVictory Communications195Homewood Suites Washington DC Capitol-Navy Yard50 M Street SEWashington DC20003
PO-009422Completed6/23/2025WASCAJory PinerConnected Room Installation (Please ask for Brendan Pavich)FALSEHiltonVictory Communications195Homewood Suites Washington DC Capitol-Navy Yard50 M Street SEWashington DC20003
BESbswy